DMJM H&N|AECOM
 
MARKETS/SERVICES
Markets
    Aerospace/Industrial
    Corporate/Commercial
    Defense
    Department of Energy
    Education
    Federal
    Hospitality
      Costa Rica Marriott
      Eden Roc Hotel
      Newport Beach Marriott
      Ray Hotel
      Sandy Lane Hotel
      St. Regis Monarch Beach
      The Omni Colonnade
      Trump Sonesta Beach
    International
    Justice
    Leisure
    Public
    Transportation
  Services
 

Marriott Hotel

Newport Beach, California

532 keys

<  >
   


DMJM Design completed master planning, architecture, and MEP engineering for this renovation project which entailed the conversion of an existing 586-room business hotel into a 532-room resort hotel. The existing facility consisted of two towers (north and south), ballroom and meeting spaces, two wings of low-rise room additions, two pool decks, and a variety of other spaces. The renovation included all guest rooms, corridors, meeting rooms, ballrooms, restaurant, south tower atrium space, public circulation and converting an existing North Tower 16th floor view lounge into presidential suites, guest rooms and suites.

New spaces were added included lobby/entry, porte cochere, spa, gym, meeting rooms and lobby lounge.  Major elements of the site renovation included a new main pool and jacuzzi, renovation of the existing lawn, and the addition of a new events lawn, new spa pool and the addition of exterior break out areas at new meeting rooms. One of the challenges of this project was converting an existing central plant that served the hotel’s hot water, steam and partial cooling/heating needs into a central plant with new equipment that serves the entire site’s cooling/heating requirements as well as its hot water requirements. In addition, the project includes the design and reconfiguration of the building and site to meet current ADA requirements.

 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer